INSTROWEST CASE study
Instrowest was approached by Jubilee Mines Cosmos Operations to help them find a solution to their chemical dosing problem.
-
NLN Lube Temperature Upgrade After successfully completing a number of shutdown maintenance campaigns at BHP Billiton’s Leinster Nickel Operations, Instrowest noted that the temperature control switches on the six different lube packs on the SAG mill were unreliable, labour intensive to calibrate and didn’t include local indication.
read more pdf -
Cosmos Nickel Cyanide Addition Instrowest was approached by Jubilee Mines Cosmos Operations to help them find a solution to their chemical dosing problem. The problem involved dosing sodium cyanide to the flotation circuit to aid the rejection of arsenic present in the ore. Cosmos c
read more pdf -
MTU Detroit Diesel - Dyno Protection and Monitoring Instruments Instrowest was approached by MTU Detroit Diesel to assist them in designing and installing a system to monitor the process variables present in their Dynamometer. The system had to be capable of monitoring real time values, alarming at pre-determ
read more pdf -
Case Study - Siemens MSI / MMI Weightometer, Accurate & Reliable Instrowest was asked by one of our clients to report on one of their weightometers. The weightometer was mounted on the discharge conveyor from an underground....
read more pdf -
Case Study - OPS Crushing & Screening – Siemens/Tecweigh Installation Instrowest was recently approached by OPS Crushing and Screening to assist them with procuring, installing and commissioning a belt weigher for a mobile stacker application for one of their clients in the Pilbara.
read more pdf -
Case Study: Completion of Repeated Maintenance Shutdown for BHPB Mount Keith Nickel Since 2009, Instrowest has been supplying Instrumentation and electrical support to the Mount Keith Nickel Concentrator for their thrice yearly plant shutdowns.
Through suppling quality tradesmen and completing all tasks to a high standard, Ins
read more pdf -
Case Study: UGL – Kwinana Power Station HEGT Instrumentation Calibrations In November of 2011, Instrowest was approached by UGL to calibrate the instrumentation on two new GE LMS100 High Efficiency Gas Turbines (HEGT’s) being installed at Verve’s Kwinana Power Station. These units came as completed vendor p
read more pdf -
Case Study: Siemens MSI / MMI Weightometer - NSR Instrowest services a number of clients in the Pilbara with onsite weightometer calibrations to ensure accuracy and reliability on a range of weightometer brands.
read more pdf -
Case-Study: Siemens MSI / MMI Weightometer – Western Areas - Cosmic Boy Concentrator Instrowest was approached by Western Areas to investigate and rectify the accuracy and repeatability issues they were having with their onsite Thermo Ramsey Weightometers. The weightometers had previously been serviced by another provider. Two te
read more pdf -
Case Study: Ravensdown Fertiliser’s- Weightometer Installation Instrowest was approached by Ravensdown Fertilisers, located in Kwinana, to provide a solution to the problems they were having in regards to weighing their products on two separate belts. Instrowest travelled to site to scope the job and in term
read more pdf