Instrowest was approached by Jubilee Mines Cosmos Operations to help them find a solution to their chemical dosing problem.

  • case-1
    BHP Billiton - Compressed Air Mass Flow Measurement

    In mid-2010, Instrowest was approached by BHP Billiton’s Nickel West to assist them with the compressed air measurement from their compressor house onsite. This consisted of a pitot tube DP flow transmitter on one line and an orifice plate

    read more download pdf
  • case-1
    Ngarda, Yarrie- Tecweigh Installation

    Ngarda approached Instrowest in November 2012 to inspect a weightometer that was reading faulty. The problem Ngarda were having was that the Integrator (a Schenck Intercont Plus) totaliser was reading backwards and also reading significantly low number

    read more download pdf
  • case-1
    MACA, Mt Dove - Tecweigh Installation

    MACA approached Instrowest in December 2012 to inspect and calibrate two weightometers on their Mt Dove minesite that were reading erratically. The problem MACA were having was that the Integrator (a Schenck Intercont Plus) was not totalising, inconsis

    read more download pdf
  • case-1
    Marvel Loch Water Addition Automation Upgrade

    In October 2010, Instrowest was approached by St Barbara’s Southern Cross Gold Operations to assist them with upgrading and automating the Mill Water Addition on their Secondary Ball Mills at their Marvel Loch processing plant.

    read more download pdf
  • case-1
    UGL – Yarraloola & Paraburdoo

    In July of 2013, Instrowest was approached by UGL to calibrate the instrumentation on two new APA gas pipeline expansion projects from Dampier to the Goldfields. Two Solar Centaur 50 compressors and associated field balance of plant instrumentati

    read more download pdf
  • case-1
    Kwinana Power Station Analyser Installation

    Instrowest were contacted by Verve Energy to help with the installation of some analysers as part of their “Water Treatment Plant” instrument upgrade. Instrowest were asked to submit a quote for consideration. The quote included all p

    read more download pdf
  • case-1
    MMG – Golden Grove - CMC Manifold Upgrade

    Instrowest was approached by our client to create a solution for the replacement of their CMC dosing system to meet further demands and maintainability.
    Instrowest scoped, quoted, designed, built and commissioned a dosing manifold from start to fi

    read more download pdf
  • case-1
    Kewdale Hire, VEI Helper X Install

    Instrowest was approached by Kewdale Hire to supply and install an onboard weigh scale system on one of their front end loaders located approximately 400km South East of Perth. The client was loading and hauling road-trains to assist with the upg

    read more download pdf
  • case-1
    Silver Lake Resources – Randall’s Gold Hydrochloric Acid Tank Level Transmitter

    Silver Lake Resources contacted Instrowest to discuss issues that they were having with their level transmitter on their hydrochloric acid tank...

    read more download pdf
  • case-1
    Wiluna Gold Weightometer Upgrade, Supply and Installation

    In June 2016 Instrowest visited Wiluna Gold to assist Practon Group with any instrumentation they required on their plant refurbishment...

    read more download pdf