INSTROWEST CASE study
Instrowest was approached by Jubilee Mines Cosmos Operations to help them find a solution to their chemical dosing problem.
-
Wiluna Gold Radar Level Supply, Install and Commission In June 2016 Instrowest visited Wiluna Gold to discuss and offer Practon Group any possible instrumentation help that they may require...
read morepdf
-
Large Nickel Concentrator Plant - Xanthate dosing control valves upgrade. The scope was to provide a solution for the issues they were experiencing with the dosing of Xanthate into their process...
read morepdf
-
Lithium Processing Plant, Reagent dosing control upgrade. Instrowest was approached by a member of Large Lithium Processing Plant’s Electrical and Instrument Engineering Department to...
read morepdf
-
Bitumen Level Measurement BGC Asphalt - Hazelmere Operations Instrowest was contacted by a member of BGC Asphalt’s compliance team to provide a solution for the monitoring of liquid bitumen stored...
read morepdf
-
Dart Valve Upgrade for BHP NickleWest Mt Keith previously had one I/P converter that controlled 4 dart valves, each with a P/P positioner on each bank of cells. Instrowest usually calibrated...
read morepdf