INSTROWEST CASE study

Instrowest was approached by Jubilee Mines Cosmos Operations to help them find a solution to their chemical dosing problem.

  • case-1
    Wiluna Gold Radar Level Supply, Install and Commission

    In June 2016 Instrowest visited Wiluna Gold to discuss and offer Practon Group any possible instrumentation help that they may require...

    read more download pdf
  • case-1
    Large Nickel Concentrator Plant - Xanthate dosing control valves upgrade.

    The scope was to provide a solution for the issues they were experiencing with the dosing of Xanthate into their process...

    read more download pdf
  • case-1
    Lithium Processing Plant, Reagent dosing control upgrade.

    Instrowest was approached by a member of Large Lithium Processing Plant’s Electrical and Instrument Engineering Department to...

    read more download pdf
  • case-1
    Bitumen Level Measurement BGC Asphalt - Hazelmere Operations

    Instrowest was contacted by a member of BGC Asphalt’s compliance team to provide a solution for the monitoring of liquid bitumen stored...

    read more download pdf
  • case-1
    Dart Valve Upgrade for BHP NickleWest

    Mt Keith previously had one I/P converter that controlled 4 dart valves, each with a P/P positioner on each bank of cells. Instrowest usually calibrated...

    read more download pdf